Internet and Wi-Fi checklist for a new home on acreage

A 15 point checklist for a new home on Pakenham acreage: nbn application timing, data points, conduit to sheds, antenna and dish positions, and power.

Internet and Wi-Fi checklist for a new home on acreage

The cheapest time to get internet right is while the frame is open and the ground is dug. On a rural block that means sorting out how the service reaches the house, where the network equipment lives, which rooms get data points, and whether conduit runs to the shed, all before plasterboard and landscaping. The 15 point checklist at the end of this page is written to hand to your builder and cabler.

When should you apply for the nbn connection?

What you need to do depends on the nbn technology at your address.

  • Fixed line areas. If the block is in a new estate or subdivision served by nbn fibre, the developer should have an nbn New Developments application in place. nbn’s guide for new property developments suggests asking the developer about this when you choose the land, and asking your builder to lodge a pre-installation request once the build is under way.
  • Pre-installation. nbn’s pre-installation request page says standard pre-installation of the connection box costs nothing extra, happens once the lock-up stage is finished, and must take place at least 3 weeks before the estimated completion date. It applies to eligible fibre to the premises addresses within an nbn New Development stage.
  • Fixed Wireless and Sky Muster areas. nbn’s new developments FAQ says no New Development application is needed, because these technologies do not use lead-in conduit or pit and pipe. You order a service through a provider and an nbn approved installer fits the antenna or dish.
  • Rebuilding on the same block. If the old house was already on the nbn, nbn says you may need a relocation works application so the connection can be moved to suit the new house.

For a small development, such as splitting a lot into two units, nbn asks for at least three months’ notice before people move in. Leave plenty of time.

Where should the internet arrive and the network cabinet sit?

Pick one spot for the incoming connection, the router and a small network cabinet. A linen cupboard or garage wall near the middle of the house often works. It should have:

  • a double power point, with a surge protector
  • room for a switch and future equipment
  • ventilation, because network gear gets warm
  • a short route to the roof for any antenna or dish cable

nbn suggests marking the connection box position, phone and data points on your house plan early, and keeping that plan to discuss with the builder.

Data points, ceiling access points and the home office

Run data cable to the places where a wired connection beats Wi-Fi:

  • the home office desk, for video calls (see our guide to working from home on acreage)
  • behind the main television
  • one ceiling point per wing or zone for an access point, powered over the data cable

Our comparison of mesh Wi-Fi and wired access points explains why ceiling access points suit long farmhouses. A copper Ethernet channel is limited to 100 metres including patch leads, so measure the furthest run on the plans.

Data cabling inside walls must be done by a registered cabler. An electrician can do it only if they also hold a cabling registration. The ACMA’s registered cabler page says you should get a signed statement that the work complies with the Wiring Rules.

Conduit to sheds and outbuildings while the ground is open

If a shed, studio, gate or bore pump might ever need a connection, lay conduit now while the trenches are open for power and water. Use a separate conduit for data, leave a draw cord in it, and mark the route on the site plan. Our page on the cost of getting internet to a shed shows how much a later trench can add.

Buried communications cabling needs a registered cabler with the underground competency. Before anyone digs, lodge a request with Before You Dig Australia.

Antenna and dish mounting points

If the address is in a Fixed Wireless or satellite area, or you plan to use 4G or 5G with an external antenna, ask the builder to:

  • leave a fixing point or reinforced section of fascia where the antenna or dish will go
  • install a conduit or cable path from that point to the network cabinet
  • keep the mount clear of trees that will grow, and away from the roof valley where water runs

A dish needs a clear view of the sky in the right direction. Our satellite internet installation service covers what an installer checks.

Power for network equipment and backup

nbn’s page on what happens in a power blackout says equipment connected to the nbn will not work during a power outage unless it has its own battery backup. On acreage, outages can last longer than a small battery. Plan:

  • a power point for a small uninterruptible power supply in the network cabinet
  • a mains power point and conduit for any outdoor link radio
  • whether a future solar battery or generator inlet should be able to run the network

The 15 point checklist for your builder and installer

  1. Confirm the nbn technology at the address.
  2. For a fixed line estate, confirm the developer’s nbn application.
  3. Lodge the pre-installation request once the build is under way, if eligible.
  4. Mark the nbn connection box position on the plans.
  5. Choose the network cabinet location.
  6. Put a double power point and ventilation in the cabinet.
  7. Run data to the office desk.
  8. Run data to the main television.
  9. Add one ceiling data point per wing for access points.
  10. Check every planned run is under 100 metres.
  11. Lay data conduit with a draw cord to each outbuilding.
  12. Lodge a Before You Dig request before trenching.
  13. Plan antenna or dish fixing points and a cable path to the cabinet.
  14. Allow for battery backup of the network equipment.
  15. Ask for the cabler’s completion statement and an as-built plan of every run.

If you have already bought, our checklist for buying acreage covers the questions to ask before settlement. Send your house plans and site layout and an independent installer can mark up data points, conduit and equipment positions before the frame goes up.

Request a free quote

Frequently asked questions

When should I apply for nbn on a new build?

In a fixed line estate, check the developer's nbn application when you buy the land, then have the builder lodge a pre-installation request once building starts. nbn asks for at least three months' notice for small developments. In Fixed Wireless and Sky Muster areas no development application is needed; you order through a provider.

Can my electrician do the data cabling?

Only if they also hold a cabling registration. Communications cabling has its own registration scheme run for the ACMA, separate from an electrical licence. Ask to see the registration card and request the signed compliance statement when the work is finished.

How many data points should a new house have?

There is no fixed number. Most rural homes benefit from a point at the office desk, one behind the main television and one in the ceiling of each wing for an access point. Add points anywhere a computer, console or camera will stay in one place, because cable is cheap while the walls are open.

Should I lay conduit to the shed now?

Yes, if there is any chance the shed, a studio, a gate or a pump will need a connection. Laying a separate data conduit with a draw cord while trenches are already open costs far less than digging again later. Mark the route on the site plan and keep a copy.

Where should the router go in a new house?

Somewhere central with power, ventilation and a short cable path to the roof, such as a linen cupboard near the middle of the house. If data cable runs to ceiling access points, the router's position matters less, because the access points spread the Wi-Fi.